Sample data and documents. These are not client results. Decisions in this demonstration do not execute external actions.
Read every stage and source
Combiner-box performance analysis
We compare measured current with the behavior expected for the same irradiance and operating conditions. Persistent differences help your team prioritize inspections and estimate the associated DC energy loss. We maintain the models as equipment and site conditions change.
- Locate the measurement
CB-14 is measured beneath inverter INV-03.
- Compare the current profile
A persistent current deficit appears in three intervals.
- Check comparable conditions
Estimate DC energy loss only for valid, complete measurements.
- Check equipment records
Confirm tags and retain the source documents with the finding.
- Review inspection priority
The performance engineer reviews location and alternative explanations.
- Open the investigation
Deliver the finding with the estimated DC loss and the next field check.
Example sources
DEMO-COMBINER-01 · Equipment map
INV-03 contains the instrumented combiner CB-14. This example cannot locate an unmeasured string.
DEMO-COMBINER-02 · Measurement window
Six five-minute current measurements at 750 V. The current difference sums to 50 A across these intervals.
Cleaning decisions with operating evidence
We combine estimated soiling losses with weather forecasts, cleaning costs and site restrictions. The workflow prepares a cleaning proposal, explains when waiting may be preferable and records the assumptions for review.
- The example current process
The same data and operating limits, with information assembled by the team.
- Identify the affected block
Select a block with a persistent estimated loss.
- Gather the planning inputs
Link the quote, forecast date and site access window.
- Calculate alternatives
Compare dry-weather and rain scenarios over the same ten-day period.
- Prepare the proposed timing
Explain when waiting is preferable or request the missing quotation.
- Review the cleaning scope
The engineer and planner review the scope before arranging field work.
- Open the planning brief
Show the scenario value, assumptions and proposed next review.
- What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-SOLAR-CLEANING-01 · Weather scenarios
The ten-day example assumes 2,000 recoverable kWh without rain and 500 kWh with rain. No probability forecast is implied.
DEMO-SOLAR-CLEANING-02 · Cleaning quotation
Fictional cleaning cost: USD 120. Energy value: USD 0.10/kWh. The access window requires planner review.
Solar generation and factory demand
We model generation and demand separately, then evaluate how production schedules affect onsite solar use. Each scenario preserves the stated production requirements and distinguishes avoided imports from exported energy.
- Align generation and demand
Use six synchronized one-hour intervals.
- Compare energy profiles
Separate onsite use, grid imports and exports.
- Confirm production flexibility
Only an explicitly flexible load can change its schedule.
- Recalculate the balance
Keep total consumption at 440 kWh and solar generation at 300 kWh.
- Open the energy study
Show the schedule comparison without claiming demand-charge savings.
Example sources
DEMO-ROOFTOP-01 · Production calendar
Both schedules preserve 440 kWh of consumption. Only the identified flexible load may move.
DEMO-ROOFTOP-02 · Energy prices
Illustrative import price USD 0.15/kWh and export value USD 0.05/kWh. Fixed charges, demand and taxes are excluded.
Explain differences in the electricity bill
We reconcile invoice items with meter records and the tariff rules supplied for the site. The workflow identifies discrepancies, requests missing information and prepares a traceable explanation for the energy and finance teams.
- The example current process
The same data and operating limits, with information assembled by the team.
- Read the invoice items
Keep energy, demand and other charges separate.
- Match identity and dates
A mismatch stops the conclusion and requests clarification.
- Recompute supported charges
Calculate the energy subtotal from the supplied agreement.
- Explain the open difference
Prepare a supplier question with the missing or mismatched evidence.
- Review the reconciliation
Energy and finance reviewers decide what to clarify with the supplier.
- Open the exception report
Show the USD 4 difference as pending reconciliation, not recovered savings.
- What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-INVOICE-REVIEW-01 · Example invoice
The short billing segment lists USD 33 of imported energy and no export credit. It excludes demand, tax and other charges.
DEMO-INVOICE-REVIEW-02 · Example agreement
Imported energy costs USD 0.15/kWh; exported energy is valued at USD 0.05/kWh for the matching meter and period.
Gearbox thermal performance assessment
We assess component temperatures against the behavior expected at comparable load and ambient conditions. Persistent deviations become investigation priorities, supported by cooling, alarm and maintenance records.
- Select the component
Identify the gearbox and supported operating range.
- Account for operating conditions
Compare observed temperature against the conditioned reference.
- Retrieve supporting evidence
Keep sensor, cooling and mechanical explanations open.
- Inspect power performance
Use comparable power-curve observations as additional context.
- Choose the next check
The performance engineer chooses the next measurement or inspection.
- Open the equipment finding
Display the 7 °C residual without a failure date or remaining-life claim.
Example sources
DEMO-WIND-HEALTH-01 · Operating reference
Expected temperatures are 55, 56, 57, 58, 58 and 57 °C. The final observed temperature is 64 °C.
DEMO-WIND-HEALTH-02 · Maintenance history
The example records a previous cooling inspection. It does not confirm a mechanical fault or the current cooling state.
Maintenance plans that account for field constraints
We bring approved job scopes, parts, crew availability and operating windows into the same planning process. The workflow compares feasible schedules and revises the proposal when a constraint changes.
- The example current process
The same data and operating limits, with information assembled by the team.
- Collect approved work
Preserve each job duration and technician requirement.
- Check dependencies
Match part arrival and qualified crew to each approved scope.
- Find a feasible schedule
Place jobs only where time, parts and crew constraints are satisfied.
- Explain the revision
Identify the binding constraint and prepare the revised proposal.
- Review the campaign
The planner reviews dependencies before making field arrangements.
- Open the planning board
Show each job, crew and proposed window; no booking is made.
- What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-WIND-MAINTENANCE-01 · Approved job scopes
A needs two hours and one technician; B needs three hours and two technicians; C needs one hour and one technician.
DEMO-WIND-MAINTENANCE-02 · Resource and access record
Three daily 08:00–12:00 windows. The toy scenario assumes suitable access conditions; actual planning requires current approved limits.
Separate battery losses from auxiliary consumption
We reconcile energy flows and assess auxiliary consumption under comparable operating conditions. The analysis helps distinguish conversion losses, cooling demand and measurement inconsistencies before selecting an engineering investigation.
- Choose a comparable cycle
Confirm comparable stored energy before calculating a cycle ratio.
- Reconcile energy flows
Keep the auxiliary meter separate from the PCS boundary.
- Change the measurement boundary
Update the ratio and its definition together.
- Review auxiliary consumption
Investigate cooling demand or measurement consistency.
- Open the energy assessment
Show losses and auxiliary consumption with explicit meter boundaries.
Example sources
DEMO-BESS-ENERGY-01 · Energy meters
PCS input 1,000 kWh; discharge 900 kWh; separately metered auxiliaries 100 kWh. No other flows are included.
DEMO-BESS-ENERGY-02 · Auxiliary reference
A comparable-condition example uses 50 kWh of auxiliary energy. This does not establish battery state of health.
Prepare evidence for warranty review
We connect warranty conditions with the measurements, test procedures and maintenance records needed for review. The workflow keeps calculation definitions visible and identifies missing or conflicting evidence before a claim is considered.
- The example current process
The same data and operating limits, with information assembled by the team.
- Identify the applicable contract
Retain the clause version and its measurement definition.
- Match the required records
Identify missing test records or conflicting revisions.
- Use the correct boundary
Compare 90% with the fictional 88% requirement under the same definition.
- Prepare the evidence package
Explain which conditions still need validation.
- Review technical eligibility
Engineering and asset management review the evidence before considering a claim.
- Open the warranty dossier
Display the evidence status without declaring a contractual breach.
- What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-WARRANTY-01 · Fictional warranty clause
The example requires a PCS energy ratio of at least 88% under a specified test procedure. This is not an actual supplier warranty.
DEMO-WARRANTY-02 · Cycle measurements
900 kWh divided by 1,000 kWh gives 90%. A matching test record is still required to assess the contractual condition.
ESP operating-condition assessment
We evaluate pump behavior in the context of speed, pressure, temperature and intervention history. Persistent deviations help engineers prioritize checks. Failure-risk estimates are an additional service when suitable historical events support validation.
- Identify the pump configuration
Confirm which equipment generated the measurements.
- Account for speed changes
The move from 50 to 55 Hz changes the current reference.
- Locate the remaining deviation
Separate the later 8 A residual from the normal speed effect.
- Retrieve the operating history
Request missing configuration records instead of estimating unsupported failure risk.
- Define the next engineering check
Production engineering reviews the finding before recommending action.
- Open the well finding
Deliver an operating investigation without changing drive settings.
Example sources
DEMO-ESP-01 · Drive measurements
Frequency is 50 Hz for two intervals and 55 Hz for four intervals. The final reference is 49 A and measured current is 57 A.
DEMO-ESP-02 · Intervention history
A pump replacement changes the configuration context. This example contains no labeled failures for probability calibration.
Review gas allocation across producing wells
We evaluate allocation alternatives using well-response models and the field's operating constraints. The workflow checks the available evidence, explains limiting conditions and prepares a proposal for production-engineering review.
- The example current process
The same data and operating limits, with information assembled by the team.
- Collect well tests and limits
Preserve test dates, units and the available gas supply.
- Check the planning evidence
Request a new test when the existing response is outdated.
- Compare feasible allocations
Enumerate feasible alternatives using the same response tables.
- Explain the limiting conditions
Prepare the modeled comparison with its assumptions and missing information.
- Review the proposal
The production engineer decides whether further testing is needed.
- Open the allocation study
Show the modeled difference without sending any controller command.
- What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-GAS-LIFT-01 · Well response tables
At 1, 2 and 3 MMscf/d, oil responses are W-1: 80/140/180, W-2: 70/90/100, W-3: 20/30/35 bbl/d.
DEMO-GAS-LIFT-02 · Field constraints
Each well needs 1–3 MMscf/d. Normal supply is 6 MMscf/d. The equal-allocation reference produces a modeled 260 bbl/d.
Energy performance adjusted for production
We compare energy use under equivalent production and operating conditions. This helps separate changes caused by product mix or throughput from deviations that deserve an equipment or process investigation.
- Match energy to production
Keep product A and product B attached to their own operating records.
- Build a comparable reference
Expected energy changes from 200 to 260 kWh with product B.
- Separate the remaining difference
The last batch differs by 40 kWh, or 4 kWh/t.
- Review operating context
Engineering selects the supporting measurements needed for investigation.
- Open the energy finding
Show the residual with the product context and proposed follow-up.
Example sources
DEMO-MANUFACTURING-01 · Batch records
Three 10-tonne batches: A, B, B. Expected energy is 200, 260, 260 kWh; observed energy is 202, 262, 300 kWh.
DEMO-MANUFACTURING-02 · Comparison scope
An energy residual prioritizes a check; it does not confirm an equipment cause. Idle consumption is not divided by zero production.
Investigate recurring equipment problems
We connect maintenance records, operating data and equipment documentation to investigate recurring problems. The workflow distinguishes reported symptoms, completed actions and confirmed causes, then prepares the evidence for the reliability team.
- The example current process
The same data and operating limits, with information assembled by the team.
- Retrieve the equipment history
Keep dates and original descriptions linked to each event.
- Separate symptoms and actions
Distinguish a completed bearing replacement from a requested alignment check.
- Resolve equipment identity
Exclude the other pump from the recurrence count.
- Summarize the chronology
Count two relevant records without declaring a confirmed cause.
- Prepare diagnostic questions
Request measurements that can distinguish the competing explanations.
- Review the investigation scope
The reliability engineer selects the next diagnostic work.
- Open the recurrence brief
Show what is known, what remains uncertain and who reviews the next step.
- What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-REPEAT-FAILURE-01 · P-101 work orders
Day 1: high vibration; bearing changed. Day 20: vibration returned; alignment check requested.
DEMO-REPEAT-FAILURE-02 · Separate equipment record
P-102, day 25: high vibration; foundation inspection. This record must not be merged into P-101.
Keep models useful after equipment changes
We investigate data and operating changes before updating a model. Candidate versions are checked against healthy operation and known events, with documented review and a path back to the previous version.
- The example current process
The same data and operating limits, with information assembled by the team.
- Locate the operating change
Determine whether data quality, a fault or equipment changes explain the shift.
- Check training eligibility
Keep unresolved faults out of the healthy training set.
- Evaluate candidate versions
Compare detection coverage and false alerts on the same evaluation data.
- Explain the tradeoff
Reject a quieter model when it misses known events.
- Review release conditions
The owner reviews a candidate while the current version remains active.
- Open the model report
Show approval status, known-event coverage and the path back to the prior version.
- What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-MODEL-CARE-01 · Evaluation record
On ten known events, current/B/C detect 8/5/8. On 100 healthy asset-days, they produce 12/3/4 false alerts.
DEMO-MODEL-CARE-02 · Review rule
The example requires at least current event coverage and fewer false alerts. A drift alert alone never authorizes deployment.
Identify assets affected by an OEM notice
We compare technical notices with equipment models, serial numbers and configuration records. The workflow separates confirmed matches from unresolved cases and prepares the evidence needed to plan the response.
- The example current process
The same data and operating limits, with information assembled by the team.
- Retrieve the technical notice
Keep the applicability clause linked to its source.
- Identify required attributes
Request the missing equipment details before concluding applicability.
- Match equipment configurations
Separate matching, excluded and unresolved equipment.
- Prepare the review list
Retain the reason and document revision for every result.
- Review the response scope
The asset engineer reviews next checks for affected or unresolved equipment.
- Open the applicability register
Show which equipment needs follow-up without issuing tasks or purchases.
- What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-OEM-BULLETINS-01 · Fictional technical notice
Applies to M1, serial 100–199 inclusive, firmware below 3. These conditions have no real equipment meaning.
DEMO-OEM-BULLETINS-02 · Equipment register
A: M1/150/2. B: M1/220/2. C: M1/unknown/2. D: M1/150/3. Missing identity cannot become an unaffected result.
Turn maintenance history into usable evidence
We organize maintenance records into traceable equipment, symptom and intervention information. Ambiguous records stay in a review queue, helping your team build a more reliable basis for analytics and model evaluation.
- The example current process
The same data and operating limits, with information assembled by the team.
- Preserve original records
Keep the original source beside every proposed field.
- Propose structured fields
Separate completed work, requested checks and negated defects.
- Check the field rules
Flag incomplete or contradictory records for review.
- Correct unsupported labels
The reviewer rejects unsupported causes and retains both versions.
- Assemble the reviewed records
Prepare linked labels without treating every repair as a failure.
- Open the evidence dataset
Show the reviewed fields and remaining uncertainty for later analysis.
- What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-MAINTENANCE-RECORDS-01 · Original work-order text
Bearing replaced; no bearing defect found; check vibration; seal replaced, leak reported.
DEMO-MAINTENANCE-RECORDS-02 · Classification rules
Preserve negation, requested versus completed actions, and reported versus confirmed causes. Four records are not four failures.
Verify performance after an intervention
We compare performance before and after a repair under suitable operating conditions. The result can show restored behavior, a remaining deviation or insufficient evidence, with the basis for each conclusion available for review.
- The example current process
The same data and operating limits, with information assembled by the team.
- Identify the intervention
Define the before and after periods without assuming recovery.
- Check comparability
Flag concurrent changes that could explain the observed difference.
- Compare normalized performance
Calculate 80% before and 98% after relative to each period reference.
- Prepare the closure evidence
Retain an inconclusive result when measurement changes are unresolved.
- Review the performance result
The performance engineer decides whether the evidence supports closure.
- Open the verification report
Show restored behavior or unresolved uncertainty with its supporting data.
- What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-INTERVENTION-REVIEW-01 · Energy comparison
Before: 416/520 kWh = 80%. After: 548.8/560 kWh = 98%. Each period contains four one-hour intervals.
DEMO-INTERVENTION-REVIEW-02 · Intervention record
The example compares normalized observations. A simultaneous sensor change must be resolved before interpreting restoration.
Rack thermal investigation
Keep charge and discharge conditions separate.
- Select comparable operating states
Keep charge and discharge conditions separate.
- Compare rack temperatures
Rack R-08 ends 6 °C above its illustrative reference.
- Review cooling and sensors
Engineering selects measurements needed to investigate the deviation.
- Open the thermal finding
Show an investigation priority, not a battery fire prediction.
Example sources
DEMO-BATTERY-01 · Rack measurements
The example compares six temperatures under matched power and charge conditions. It does not estimate failure probability.
Rod-pump investigation
Retain measurement location, load units and stroke direction.
- Locate the surface card
Retain measurement location, load units and stroke direction.
- Compare card shape
Highlight a shape difference without assigning a downhole cause.
- Review well context
Production engineering reviews whether the conditions support interpretation.
- Open the well investigation
Prepare the next check with unresolved conditions visible.
Example sources
DEMO-ROD-PUMP-01 · Surface dynamometer card
The example shows load in kN against normalized stroke in percent. It is not a calculated downhole pump card.