01 / THE CORE PACKAGE
A defined scope
for each operation.
Start with the assets and data that matter. We agree on scope and success criteria before building.
INCLUDED WITHIN THE AGREED SCOPE
Wind Core analytics
01Component behavior under comparable conditions
02condition-adjusted power performance
03sensor consistency checks
04prioritized investigations and model monitoring
Data assessment, model validation, and delivery into your tools: Power BI, Tableau, custom applications or CMMS.
Additional services
Optional modules selected for value and data readiness.
+
Yaw/pitch investigations
+
CMS vibration analysis
+
alarm-sequence models
+
maintenance campaigns and contract evidence
Data and technical scope
SCADA power, wind, ambient and component temperatures, operating states, alarms and maintenance history. Vibration diagnostics require CMS measurements.
A temperature deviation is an investigation signal. Confirm causes with maintenance evidence; validate failure predictions against labeled historical events.
02 / WHAT A FINDING LOOKS LIKE
Gearbox thermal performance assessment
We assess component temperatures against the behavior expected at comparable load and ambient conditions. Persistent deviations become investigation priorities, supported by cooling, alarm and maintenance records.
ILLUSTRATIVE EXAMPLE · NOT A CLIENT RESULT
INDUSTRYNORTH / OPERATIONS WORKSPACEILLUSTRATIVE EXAMPLE
Sources, analysis and decisions in view.
WT-07 / GEARBOX
Gearbox thermal performance assessment
We assess component temperatures against the behavior expected at comparable load and ambient conditions. Persistent deviations become investigation priorities, supported by cooling, alarm and maintenance records.
The stages and sources are available in the transcript.
Inspection view
Sample data and documents. These are not client results. Decisions in this demonstration do not execute external actions.
Read every stage and source
Gearbox thermal performance assessment
We assess component temperatures against the behavior expected at comparable load and ambient conditions. Persistent deviations become investigation priorities, supported by cooling, alarm and maintenance records.
Select the component
Identify the gearbox and supported operating range.
Account for operating conditions
Compare observed temperature against the conditioned reference.
Retrieve supporting evidence
Keep sensor, cooling and mechanical explanations open.
Inspect power performance
Use comparable power-curve observations as additional context.
Choose the next check
The performance engineer chooses the next measurement or inspection.
Open the equipment finding
Display the 7 °C residual without a failure date or remaining-life claim.
Example sources
DEMO-WIND-HEALTH-01 · Operating reference Expected temperatures are 55, 56, 57, 58, 58 and 57 °C. The final observed temperature is 64 °C.
DEMO-WIND-HEALTH-02 · Maintenance history The example records a previous cooling inspection. It does not confirm a mechanical fault or the current cooling state.
INTERACTIVE ANALYSIS / ILLUSTRATIVE DATA
Turbine power performance
Compare measurements with a reference, check operating conditions, and inspect the data behind the finding.
The curves use fictional data and documented modeling references. They are not manufacturer guarantees or a trained machine-learning model.
01Reference model
Compares equivalent conditions and separates operating states.
02Investigation agent
Connects the finding to records, alarms and documentation.
03Performance engineer
Reviews possible explanations and selects the next check.
04Equipment report
Presents the deviation, its sources and proposed actions.
Method, assumptions and sources
Sixty fictional ten-minute intervals. Energy difference is calculated per interval for comparable observations only, not from the visual area between curves. Values are illustrative, not client results.
Synthetic 2.5 MW reference: cut-in at 3 m/s, rated output at 12 m/s and cut-out at 25 m/s. Wind speed is density-adjusted. The example alone does not identify wake effects, yaw effects or faults. Power Curve Working Group
03 / FROM EVIDENCE TO DECISION
From analysis to engineering review.
Explore each stage. See the sources, the proposal, and the point where your team decides.
INDUSTRYNORTH / OPERATIONS WORKSPACEILLUSTRATIVE EXAMPLE
Sources, analysis and decisions in view.
WIND / CAMPAIGN 01
Maintenance plans that account for field constraints
We bring approved job scopes, parts, crew availability and operating windows into the same planning process. The workflow compares feasible schedules and revises the proposal when a constraint changes.
The stages and sources are available in the transcript.
Inspection view
Sample data and documents. These are not client results. Decisions in this demonstration do not execute external actions.
Read every stage and source
Maintenance plans that account for field constraints
We bring approved job scopes, parts, crew availability and operating windows into the same planning process. The workflow compares feasible schedules and revises the proposal when a constraint changes.
The example current process
The same data and operating limits, with information assembled by the team.
Collect approved work
Preserve each job duration and technician requirement.
Check dependencies
Match part arrival and qualified crew to each approved scope.
Find a feasible schedule
Place jobs only where time, parts and crew constraints are satisfied.
Explain the revision
Identify the binding constraint and prepare the revised proposal.
Review the campaign
The planner reviews dependencies before making field arrangements.
Open the planning board
Show each job, crew and proposed window; no booking is made.
What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-WIND-MAINTENANCE-01 · Approved job scopes A needs two hours and one technician; B needs three hours and two technicians; C needs one hour and one technician.
DEMO-WIND-MAINTENANCE-02 · Resource and access record Three daily 08:00–12:00 windows. The toy scenario assumes suitable access conditions; actual planning requires current approved limits.