Theiss battery storage facility in Austria; licensed photograph

INDUSTRYNORTH / Battery storage

Battery performance across operating cycles.

Investigate battery and auxiliary-system performance, validate health estimates and organize warranty evidence.

REAL PHOTOGRAPH · THEISS, AUSTRIA · BP 95 / CC BY 4.0Credits

01 / THE CORE PACKAGE

A defined scope for each operation.

Start with the assets and data that matter. We agree on scope and success criteria before building.

INCLUDED WITHIN THE AGREED SCOPE

Battery storage
Core analytics

  • 01Rack behavior by operating state
  • 02voltage and temperature consistency
  • 03energy and auxiliary-consumption analysis
  • 04prioritized engineering findings

Data assessment, model validation, and delivery into your tools: Power BI, Tableau, custom applications or CMMS.

Additional services

Optional modules selected for value and data readiness.

+

Health estimates checked against tests

+

dispatch/degradation scenarios

+

warranty evidence

+

capacity-test and augmentation planning

Data and technical scope

BMS cell/rack voltage and temperatures, current, state of charge, PCS/EMS data and auxiliary power. Health estimation also needs adequate operating history and capacity-test references.

Analytics supports engineering review and complements the BMS and site protections. A thermal anomaly is not a prediction of a fire. Dispatch scenarios require explicit market and operating assumptions.

02 / WHAT A FINDING LOOKS LIKE

Separate battery losses from auxiliary consumption

We reconcile energy flows and assess auxiliary consumption under comparable operating conditions. The analysis helps distinguish conversion losses, cooling demand and measurement inconsistencies before selecting an engineering investigation.

ILLUSTRATIVE EXAMPLE · NOT A CLIENT RESULT
INDUSTRYNORTH / OPERATIONS WORKSPACEILLUSTRATIVE EXAMPLE
Sources, analysis and decisions in view.

BESS / PCS-01

Separate battery losses from auxiliary consumption

We reconcile energy flows and assess auxiliary consumption under comparable operating conditions. The analysis helps distinguish conversion losses, cooling demand and measurement inconsistencies before selecting an engineering investigation.

The stages and sources are available in the transcript.

0:00

Sample data and documents. These are not client results. Decisions in this demonstration do not execute external actions.

Read every stage and source

Separate battery losses from auxiliary consumption

We reconcile energy flows and assess auxiliary consumption under comparable operating conditions. The analysis helps distinguish conversion losses, cooling demand and measurement inconsistencies before selecting an engineering investigation.

  1. Choose a comparable cycle

    Confirm comparable stored energy before calculating a cycle ratio.

  2. Reconcile energy flows

    Keep the auxiliary meter separate from the PCS boundary.

  3. Change the measurement boundary

    Update the ratio and its definition together.

  4. Review auxiliary consumption

    Investigate cooling demand or measurement consistency.

  5. Open the energy assessment

    Show losses and auxiliary consumption with explicit meter boundaries.

Example sources

DEMO-BESS-ENERGY-01 · Energy meters
PCS input 1,000 kWh; discharge 900 kWh; separately metered auxiliaries 100 kWh. No other flows are included.

DEMO-BESS-ENERGY-02 · Auxiliary reference
A comparable-condition example uses 50 kWh of auxiliary energy. This does not establish battery state of health.

03 / FROM EVIDENCE TO DECISION

From analysis to engineering review.

Explore each stage. See the sources, the proposal, and the point where your team decides.

INDUSTRYNORTH / OPERATIONS WORKSPACEILLUSTRATIVE EXAMPLE
Sources, analysis and decisions in view.

BESS / CONTRACT 01

Prepare evidence for warranty review

We connect warranty conditions with the measurements, test procedures and maintenance records needed for review. The workflow keeps calculation definitions visible and identifies missing or conflicting evidence before a claim is considered.

The stages and sources are available in the transcript.

0:00

Sample data and documents. These are not client results. Decisions in this demonstration do not execute external actions.

Read every stage and source

Prepare evidence for warranty review

We connect warranty conditions with the measurements, test procedures and maintenance records needed for review. The workflow keeps calculation definitions visible and identifies missing or conflicting evidence before a claim is considered.

  1. The example current process

    The same data and operating limits, with information assembled by the team.

  2. Identify the applicable contract

    Retain the clause version and its measurement definition.

  3. Match the required records

    Identify missing test records or conflicting revisions.

  4. Use the correct boundary

    Compare 90% with the fictional 88% requirement under the same definition.

  5. Prepare the evidence package

    Explain which conditions still need validation.

  6. Review technical eligibility

    Engineering and asset management review the evidence before considering a claim.

  7. Open the warranty dossier

    Display the evidence status without declaring a contractual breach.

  8. What changes with agent assistance

    Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.

Example sources

DEMO-WARRANTY-01 · Fictional warranty clause
The example requires a PCS energy ratio of at least 88% under a specified test procedure. This is not an actual supplier warranty.

DEMO-WARRANTY-02 · Cycle measurements
900 kWh divided by 1,000 kWh gives 90%. A matching test record is still required to assess the contractual condition.

Rack thermal investigation

Keep charge and discharge conditions separate.

  1. Select comparable operating states

    Keep charge and discharge conditions separate.

  2. Compare rack temperatures

    Rack R-08 ends 6 °C above its illustrative reference.

  3. Review cooling and sensors

    Engineering selects measurements needed to investigate the deviation.

  4. Open the thermal finding

    Show an investigation priority, not a battery fire prediction.

Example sources

DEMO-BATTERY-01 · Rack measurements
The example compares six temperatures under matched power and charge conditions. It does not estimate failure probability.

Explore the use cases

04 / MANAGED ANALYTICS

Models maintained through operating changes.

Equipment changes. Sensors drift. Operations evolve. We keep models aligned with that reality.

Explore model maintenance
  1. 01Monitor data quality and model drift
  2. 02Investigate changes before retraining
  3. 03Validate on held-out periods and known events
  4. 04Review versions, deployment and rollback
  5. 05Incorporate engineering feedback