REAL PHOTOGRAPH · THEISS, AUSTRIA · BP 95 / CC BY 4.0Credits
01 / THE CORE PACKAGE
A defined scope
for each operation.
Start with the assets and data that matter. We agree on scope and success criteria before building.
INCLUDED WITHIN THE AGREED SCOPE
Battery storage Core analytics
01Rack behavior by operating state
02voltage and temperature consistency
03energy and auxiliary-consumption analysis
04prioritized engineering findings
Data assessment, model validation, and delivery into your tools: Power BI, Tableau, custom applications or CMMS.
Additional services
Optional modules selected for value and data readiness.
+
Health estimates checked against tests
+
dispatch/degradation scenarios
+
warranty evidence
+
capacity-test and augmentation planning
Data and technical scope
BMS cell/rack voltage and temperatures, current, state of charge, PCS/EMS data and auxiliary power. Health estimation also needs adequate operating history and capacity-test references.
Analytics supports engineering review and complements the BMS and site protections. A thermal anomaly is not a prediction of a fire. Dispatch scenarios require explicit market and operating assumptions.
02 / WHAT A FINDING LOOKS LIKE
Separate battery losses from auxiliary consumption
We reconcile energy flows and assess auxiliary consumption under comparable operating conditions. The analysis helps distinguish conversion losses, cooling demand and measurement inconsistencies before selecting an engineering investigation.
ILLUSTRATIVE EXAMPLE · NOT A CLIENT RESULT
INDUSTRYNORTH / OPERATIONS WORKSPACEILLUSTRATIVE EXAMPLE
Sources, analysis and decisions in view.
BESS / PCS-01
Separate battery losses from auxiliary consumption
We reconcile energy flows and assess auxiliary consumption under comparable operating conditions. The analysis helps distinguish conversion losses, cooling demand and measurement inconsistencies before selecting an engineering investigation.
The stages and sources are available in the transcript.
Inspection view
Sample data and documents. These are not client results. Decisions in this demonstration do not execute external actions.
Read every stage and source
Separate battery losses from auxiliary consumption
We reconcile energy flows and assess auxiliary consumption under comparable operating conditions. The analysis helps distinguish conversion losses, cooling demand and measurement inconsistencies before selecting an engineering investigation.
Choose a comparable cycle
Confirm comparable stored energy before calculating a cycle ratio.
Reconcile energy flows
Keep the auxiliary meter separate from the PCS boundary.
Change the measurement boundary
Update the ratio and its definition together.
Review auxiliary consumption
Investigate cooling demand or measurement consistency.
Open the energy assessment
Show losses and auxiliary consumption with explicit meter boundaries.
Example sources
DEMO-BESS-ENERGY-01 · Energy meters PCS input 1,000 kWh; discharge 900 kWh; separately metered auxiliaries 100 kWh. No other flows are included.
DEMO-BESS-ENERGY-02 · Auxiliary reference A comparable-condition example uses 50 kWh of auxiliary energy. This does not establish battery state of health.
03 / FROM EVIDENCE TO DECISION
From analysis to engineering review.
Explore each stage. See the sources, the proposal, and the point where your team decides.
INDUSTRYNORTH / OPERATIONS WORKSPACEILLUSTRATIVE EXAMPLE
Sources, analysis and decisions in view.
BESS / CONTRACT 01
Prepare evidence for warranty review
We connect warranty conditions with the measurements, test procedures and maintenance records needed for review. The workflow keeps calculation definitions visible and identifies missing or conflicting evidence before a claim is considered.
The stages and sources are available in the transcript.
Inspection view
Sample data and documents. These are not client results. Decisions in this demonstration do not execute external actions.
Read every stage and source
Prepare evidence for warranty review
We connect warranty conditions with the measurements, test procedures and maintenance records needed for review. The workflow keeps calculation definitions visible and identifies missing or conflicting evidence before a claim is considered.
The example current process
The same data and operating limits, with information assembled by the team.
Identify the applicable contract
Retain the clause version and its measurement definition.
Match the required records
Identify missing test records or conflicting revisions.
Use the correct boundary
Compare 90% with the fictional 88% requirement under the same definition.
Prepare the evidence package
Explain which conditions still need validation.
Review technical eligibility
Engineering and asset management review the evidence before considering a claim.
Open the warranty dossier
Display the evidence status without declaring a contractual breach.
What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-WARRANTY-01 · Fictional warranty clause The example requires a PCS energy ratio of at least 88% under a specified test procedure. This is not an actual supplier warranty.
DEMO-WARRANTY-02 · Cycle measurements 900 kWh divided by 1,000 kWh gives 90%. A matching test record is still required to assess the contractual condition.
Rack thermal investigation
Keep charge and discharge conditions separate.
Select comparable operating states
Keep charge and discharge conditions separate.
Compare rack temperatures
Rack R-08 ends 6 °C above its illustrative reference.
Review cooling and sensors
Engineering selects measurements needed to investigate the deviation.
Open the thermal finding
Show an investigation priority, not a battery fire prediction.
Example sources
DEMO-BATTERY-01 · Rack measurements The example compares six temperatures under matched power and charge conditions. It does not estimate failure probability.