REAL OPERATIONS · LICENSED ILLUSTRATIVE FOOTAGECredits
01 / THE CORE PACKAGE
A defined scope
for each operation.
Start with the assets and data that matter. We agree on scope and success criteria before building.
INCLUDED WITHIN THE AGREED SCOPE
Manufacturing Core analytics
01Equipment models by operating mode
02production-normalized energy analysis
03persistent-deviation assessment
04maintenance evidence and model monitoring
Data assessment, model validation, and delivery into your tools: Power BI, Tableau, custom applications or CMMS.
Additional services
Optional modules selected for value and data readiness.
+
Utilities efficiency
+
quality soft sensors
+
validated event-risk models
+
repeat-failure and maintenance-work-package workflows
Data and technical scope
PLC/historian signals, operating modes, production counts, product/batch context and maintenance records. Quality models need aligned laboratory or inspection labels.
Compare like operating conditions and product mixes. Statistical associations prioritize investigation; they do not establish a confirmed physical cause.
02 / WHAT A FINDING LOOKS LIKE
Energy performance adjusted for production
We compare energy use under equivalent production and operating conditions. This helps separate changes caused by product mix or throughput from deviations that deserve an equipment or process investigation.
ILLUSTRATIVE EXAMPLE · NOT A CLIENT RESULT
INDUSTRYNORTH / OPERATIONS WORKSPACEILLUSTRATIVE EXAMPLE
Sources, analysis and decisions in view.
FACTORY / LINE 02
Energy performance adjusted for production
We compare energy use under equivalent production and operating conditions. This helps separate changes caused by product mix or throughput from deviations that deserve an equipment or process investigation.
The stages and sources are available in the transcript.
Inspection view
Sample data and documents. These are not client results. Decisions in this demonstration do not execute external actions.
Read every stage and source
Energy performance adjusted for production
We compare energy use under equivalent production and operating conditions. This helps separate changes caused by product mix or throughput from deviations that deserve an equipment or process investigation.
Match energy to production
Keep product A and product B attached to their own operating records.
Build a comparable reference
Expected energy changes from 200 to 260 kWh with product B.
Separate the remaining difference
The last batch differs by 40 kWh, or 4 kWh/t.
Review operating context
Engineering selects the supporting measurements needed for investigation.
Open the energy finding
Show the residual with the product context and proposed follow-up.
Example sources
DEMO-MANUFACTURING-01 · Batch records Three 10-tonne batches: A, B, B. Expected energy is 200, 260, 260 kWh; observed energy is 202, 262, 300 kWh.
DEMO-MANUFACTURING-02 · Comparison scope An energy residual prioritizes a check; it does not confirm an equipment cause. Idle consumption is not divided by zero production.
03 / FROM EVIDENCE TO DECISION
From analysis to engineering review.
Explore each stage. See the sources, the proposal, and the point where your team decides.
INDUSTRYNORTH / OPERATIONS WORKSPACEILLUSTRATIVE EXAMPLE
Sources, analysis and decisions in view.
P-101 / MAINTENANCE
Investigate recurring equipment problems
We connect maintenance records, operating data and equipment documentation to investigate recurring problems. The workflow distinguishes reported symptoms, completed actions and confirmed causes, then prepares the evidence for the reliability team.
The stages and sources are available in the transcript.
Inspection view
Sample data and documents. These are not client results. Decisions in this demonstration do not execute external actions.
Read every stage and source
Investigate recurring equipment problems
We connect maintenance records, operating data and equipment documentation to investigate recurring problems. The workflow distinguishes reported symptoms, completed actions and confirmed causes, then prepares the evidence for the reliability team.
The example current process
The same data and operating limits, with information assembled by the team.
Retrieve the equipment history
Keep dates and original descriptions linked to each event.
Separate symptoms and actions
Distinguish a completed bearing replacement from a requested alignment check.
Resolve equipment identity
Exclude the other pump from the recurrence count.
Summarize the chronology
Count two relevant records without declaring a confirmed cause.
Prepare diagnostic questions
Request measurements that can distinguish the competing explanations.
Review the investigation scope
The reliability engineer selects the next diagnostic work.
Open the recurrence brief
Show what is known, what remains uncertain and who reviews the next step.
What changes with agent assistance
Compare preparation tasks and the evidence delivered; engineering decisions remain explicit.
Example sources
DEMO-REPEAT-FAILURE-01 · P-101 work orders Day 1: high vibration; bearing changed. Day 20: vibration returned; alignment check requested.
DEMO-REPEAT-FAILURE-02 · Separate equipment record P-102, day 25: high vibration; foundation inspection. This record must not be merged into P-101.